| Apogee |
| Apogee, at the top of the upscale condo market in South Florida is located in South Beach. FCU was hired by John Moriority of Florida to Pump, place and finish the concrete at this prominient SOBE condo. |
| |
|
 |
|
|
| |
|
|
| Banyon |
| FCU utilized two 61 meters, two 55 meters, 4 laser screeds, and 32 mud-men to place the concrete at 20,000 square feet per hour in a total of 11 hours. |
| |
|
 |
|
|
| |
|
|
| Downtown Dadeland |
| At the begging of this project there was a large amont of talk as it had the apperance of a lake. Some would wonder, "how are you going to get all that water out of there." Moss and Associates directed Ebsary and Florida Concrete to pour a trimmy seal 25' under water untill each sector is water proofed.....Full Story
inside. |
| |
|
 |
|
|
| |
|
|
| Everglades on the Bay |
| Both of these huge towers each rest on 5,500 cubic yard foundations poured at the very begining of the project on back2back weekends. |
| |
|
 |
|
|
| |
|
|
| FalconTrust Air Hanger |
| Turnning High FF/FL numbers on new idea for Falcon Trust, a high Profile FBO that's becoming known throughout the world. |
| |
|
 |
|
|
| |
|
|
| I75 and I595 |
| Complicated pour turned into another successful project. FCU provided Gimrock Construction a Hialeah based bridge contractor with two 39X Boom Pumps for an early morning deck pour. FCU mobilized one 39X on a floating barge and another on the embankment with 400 feet of 5 inch line joining the two. |
| |
|
 |
|
|
| |
|
|
| IVY/MINT |
| IVY - 55 Story
MINT - 60 Story |
| |
|
 |
|
|
| |
|
|
| Marina Blue |
| Towering in front of the American Airlines Arena you will notice a Massive 58 Story. |
| |
|
 |
|
|
| |
|
|
| Marlins Garage's |
| 2.5 Million Square feet of Flat Work. This project consists of 4 building's between 5 and 6 floors high, Casting Beds, Tilt Panels and PSI Decks. This is a concrete finishing Monster!! |
| |
|
 |
|
|
| |
|
|
| Palm Ave Garage |
| 5 Story Parking Garage in Downtown Sarasota. This Garage is roughly 230,000 Square Feet of Flatwork. FCU utilized a Ground Mounted 39M Placing Boom, KVM 55M and 61SX for Concrete Placement. |
| |
|
 |
|
|
| |